Jaks Party Power
  • Home
  • About
  • Services
  • Hire
    • Packages
    • Generators
    • Distribution
    • Cables
    • Fuel
    • Accessories
    • Lighting
  • Blogs
  • Contact Us
Select Page
Common venue electrical failures: the UK planner’s guide

Common venue electrical failures: the UK planner’s guide

by rob | Aug 7, 2026 | Event Power Guides

The most common venue electrical failures are RCD nuisance trips, overloaded circuits, generator earthing faults, damaged cables and connectors, unlabelled distribution, and supply instability from non-linear loads. When any of these occur, the immediate steps are:...
Generator hire contracts for UK venue operators: 2026 guide

Generator hire contracts for UK venue operators: 2026 guide

by rob | Aug 6, 2026 | Event Power Guides

Any generator-hire agreement worth signing must specify the equipment by make, model, serial number and kVA rating; fix precise delivery and collection windows; define SLA response times for breakdown; state exactly when risk passes; and name a Senior Person...
LX Services alternatives for UK event power in 2026

LX Services alternatives for UK event power in 2026

by rob | Aug 5, 2026 | Event Power Guides

Jakspartypower is the top recommended alternative to LX Services for event organisers in the UK, particularly for Sussex-based events requiring a turnkey, BS 7909-compliant partner who will formally accept the Responsible Person role. Three supplier types round out...
Thorncliffeeventpower.co.uk alternatives: UK event power options

Thorncliffeeventpower.co.uk alternatives: UK event power options

by rob | Aug 4, 2026 | Event Power Guides

For Sussex and South East events, Jaks Party Power is the strongest like-for-like alternative to thorncliffeeventpower.co.uk offering generators, distribution boards, cabling, and a standby engineer service. For large-scale festivals or multi-site productions,...
Event electrical distribution options compared for planners

Event electrical distribution options compared for planners

by rob | Aug 3, 2026 | Event Power Guides

For most UK outdoor festivals and large shows, generator-fed three-phase distribution with RCD-protected sub-boards is the right call. For small indoor venue events, a temporary mains supply with local sub-distribution boards is usually simpler, cheaper, and perfectly...
Event setup service providers comparison: UK planner’s guide

Event setup service providers comparison: UK planner’s guide

by rob | Aug 2, 2026 | Event Power Guides

For UK events requiring robust temporary power, Jakspartypower is the recommended first call. With extensive electrical contracting experience, documented BS 7909 and BS 7671 compliance, site-specific electrical designs, and a dedicated on-site standby service, they...
« Older Entries
Next Entries »

Recent Posts

  • Festoon lighting for UK events: DIY safety steps and when to hire
  • 3 safety first defences UK event planners use to stop generator theft
  • 10-Point Compliance Checklist for Wedding Lighting Design — UK Planners
  • Avoid Refused Deliveries: Generator Delivery Access for UK Planners
  • IP44, IP65, IP67: Outdoor IP Ratings UK Event Planners Must Specify

Recent Comments

No comments to show.

Contact Details

P: 01273 063887

M: 07725 356419

E: [email protected]

Address

Unit 41, Morehouse Farm
Wivelsfield, East Sussex
RH17 7RE

Policies

Terms & Conditions
Privacy Policy

Info

Home
About
Services
Product Hire
Event Setup
Electrical Contracting
Marquees

Hire

Generators
Cables
Distribution
Adapters / Accessories
Lighting
Fuel

Website Design

×
1
Product selection
2
Contact information
3
Review information